york chiller high vsd baseplate temp

york chiller high vsd baseplate temp

45 - Sample Printout (Setpoints) (15 or 30 min de mand). Faulty pump glycol The display shows: SUS1 LOCKOUT : HIGH VSD BASEPLATE TEMP. Please, provide technical support and help Sincerely, Anatoly. View online or download York VSD 351 Operation Manual. In 2004, an air-cooled screw chiller equipped with water-cooled VSD was introduced. Commercial facilities prefer the chiller model because they require less maintenance than other models, are energy efficient, and offer quality cooling. The idea is to drive the equipment to work less but produce the exact cooling effect needed. Commercial chillers help to keep the cost of maintaining cool air lower. Air-cooled screw liquid chillers e/v high efficiency and s/p standard efficiency, INSTALLATION, OPERATION, MAINTENANCE Supersedes: 201.23-NM2 (919), E/V HIGH EFFICIENCY AND S/P STANDARD EFFICIENCY, Air-cooled screw liquid chillers with variable speed drive (80 pages), Air-cooled screw liquid chillers Excess charge in system and high discharge pressure - For this also, you have to check the subcooling process. 48 - Sample Printout (History), Page 122: Fig. YORK YMC2 VSD - HIGH C PHASE MOTOR BASEPLATE TEMP. Additionally, the cooling equipment is sustainable and energy-efficient. 44 - Sample Printout (Status), Page 119: Fig. 221. Since then the VSD cool side was flushed with distilled water and refilled accordingly. Should the glycol be completely removed before startup? Low leaving chilled liquid - Chiller fault. HVAC units provide cool air inside buildings. endstream endobj 546 0 obj <>stream Drained glycol, and replaced with new. 13 - Pre-Rotation Vanes Calibration Screen, Page 41: Fig. Commercial facilities prefer the chiller model because they require less maintenance than other models, are energy efficient, and offer quality cooling. The cooling water is piped to a plate and frame heat exchanger, located on the rear of the VSD enclosure, where it removes heat from the secondary coolant circulated inside the VSD enclosure. 54 - Operation Sequence & Timing Diagram (Electro-Mechanical & Solid State Starter Applications), Fig. 18. 220. No display on the control panel and unit will not run. York chiller works as the heart of any HVAC system. 5. She has a great understanding of today's marketing strategies that yield strong results and always happy to create valuable content & share her thoughts. WebUS Air Conditioning Distributors Southern California Engineering Web165-1,000 TR (580-3,516 kW) The YORK YMC chiller reduces energy consumption and increases efficiency via advanced design and active magnetic-bearing technology. Fig 1 - PWM Current Waveform. Residue inhibits the ability of features to aid in the transfer of heat. High superheat - Measure superheat with gauges and thermocouples and determine the reason behind high discharge temperature. WebYork VSD 351 Pdf User Manuals. 62 - Charging Oil Reservoir With Oil, Page 145: Fig. Replace if necessary. 18. 95 0 obj <> endobj Preventive maintenance kits can help to slow down performance issues with regular service. Post photos, respond to polls and access other special features. WebVSD HIGH PHASE B INVERTER HEATSINK TEMPERATURE (Style D VSD) See Phase A message above. 18. VSD board is defective: VSD Logic board needs to be replaced to fix the fault. 16 - Electro-Mechanical Starter Screen, Page 42: Fig. 66 - Motor Stator Temperature, Page 152: Section 9 Preventive Maintenance, Page 154: Section 10 Optisave Energy Analyser Feature. Please enter a password for your user account. Condenser fans not operating or running backward - Check and fix the problem of fans. Furthermore, managing the flow of pressure and temperature of H20 is equally as important. Since pioneering the concept in 1979, weve installed more variable speed equipped chiller than all other chiller manufactures combined. The #1 question asked by NEW MEMBERS. 34 - History Details Screen, Page 80: Fig. Web165-1,000 TR (580-3,516 kW) The YORK YMC chiller reduces energy consumption and increases efficiency via advanced design and active magnetic-bearing technology. 221. 21 - VARIABLE SPEED DRIVE DETAILS SCREEN (VSD with Part Number 371-02767-XXX (60 Hz) or 371-03700-XXX (50 Hz)), Fig. The York VSD model employs vapor compression. Questions About Becoming A Professional Member? VSD Fault: High baseplate temperature. York preventative maintenance kits for chillers only add to a better financial outcome for companies. 4- how can i get the coolant away from York wiz low price ? Please enter the name by which you would like to log-in and be known on this site. I assumed there could be a problem with the hb```O,@r1129n32 572 0 obj <>stream York VSD industrial Coolantfor chillers allows the HVAC equipment to perform at or above expectations with greater ease. 8. Inspect if the flow is below the minimum for chiller. You need to check 1 FU, 2FU, 4FU, 5FU, 17FU or 19FU and 2T/ 10T transformers. Low coolant level: If you observed that the coolant level is low, then you need to add coolant to the system. The display shows: SUS1 LOCKOUT : HIGH VSD BASEPLATE TEMP. Check condenser fans whether they are not operating or running backward. Find maintenance kits for chillers at Midwest Parts Center. Broken chiller components will cause energy costs to increase quickly. WebUS Air Conditioning Distributors Southern California Engineering The ARPA Zone/Open Membership Discussion Forums. Wide operating range to meet the needs of various applications. Single Point Circuit Breaker. 105 0 obj <>/Filter/FlateDecode/ID[<03145C835C9FDA9A867BB52490E3DCDE><6B0590C16CC1014FB7DE74725554FB7B>]/Index[95 47]/Info 94 0 R/Length 71/Prev 750582/Root 96 0 R/Size 142/Type/XRef/W[1 2 1]>>stream Since pioneering the concept in 1979, weve installed more variable speed equipped chiller than all other chiller manufactures combined. Since then the VSD cool side was flushed with distilled water and refilled accordingly. In the York chiller manual, you can see detailed steps regarding your specific model. In the past reactive service was the response to repair problems. This heat transfer device relies on the physical state of a refrigerant as it circulates through the chiller system. The machines work by two methods: vapor absorption and vapor compression. !sO RD6UjzD\4QLF|q rf..'.W]7 y\8*~ E]=>|'>~1UIy/`oyG/\Y(>]v2jqaWcSz60Sp4Ma T^-U+iY : Gain access to our free AOP (Ask a Professional) Section to get real answers for your questions. All units are designed to be located latest technology in variable speed drives. Through a process of heat extraction, the equipment provides coolant at a steady temperature. 56 - Minimum Entering Condensing Water Temperature, Page 129: Fig. replacement cost of IGBT in Dubai is 25000 AED(6,800USD). e/v high efficiency and s/p standard efficiency (310 pages), Air-cooled scroll chillers with brazed plate heat exchangers style e (105 pages), Manual will be automatically added to "My Manuals", Maintenance Requirements for Yciv Chillers, Electrical Wiring Diagrams - 2 Compressor Models, Isolator Information for Units Shipped on or after June 15, 2008, Isolator Information for Units Shipped before June 15, 2008, Electrical Wiring Diagrams - 3 Compressor Models, VSD Logic to Chiller Microprocessor Board RS-485 Communication Configuration Jumpers, Minimum VSD Compressor Start / Run Frequency, Acceleration / Deceleration Rate When Starting / Stopping Compressors, VSD Temperature Control, Operation of the Coolant Pump, and VSD Cabinet Cooling Fans, Flash Tank Drain and Feed Valve Controller, BACNET, MODBUS and YORKTALK 2 Communications, Maintenance Requirements for YCIV Chillers, Chilled Liquid and Suction Temperature Sensor Input Voltage, Chiller York YCIV 0590-1500 50Hz Start-Up Checklist, Chiller York MILLENNIUM YCAS0130 User Manual, Chiller York YCAS0130 Installation, Operation & Maintenance Manual, Chiller York YCAL0080SC Installation Operation & Maintenance, Chiller York YCAL0019 Installation, Operation And Maintenance Manual, Chiller York YCAL0019 Installation Operation & Maintenance, Chiller York YCAS0098EB Installation Operation & Maintenance, Chiller York YCAV0157-0267 Installation Operation & Maintenance, Chiller York YCAL Series Start-Up Checklist, Page 11: Section 1 - General Chiller Information And Safety, Page 16: Figure 1 - Chiller Control System, Page 29: Section 3 - Rigging, Handling And Storage, Page 66: Figure 8 - Two Compressor Wiring Diagram With Circuit Breaker, Page 67: Figure 10 - Three Compressor Wiring Diagram With Circuit Breaker - Single Point, Page 82: Electrical Wiring Diagrams - 2 Compressor Models, Page 84: Figure 13 - Elementary Power Wiring Diagram - Yciv0157-0267 2 Compressor Models, Page 86: Figure 14 - Power Wiring Connection Diagram - Yciv0157-0267 2 Compressor Models, Page 88: Figure 15 - Control Wiring Connection Diagram - Yciv0157-0267 2 Compressor Models, Page 91: Figure 16 - Power Elementary Wiring Diagram - Yciv0157-0267 2 Compressor Models, Page 96: Electrical Wiring Diagrams - 3 Compressor Models, Page 100: Figure 18 - Power Elementary Diagram - Yciv0257-0397 3 Compressor Models, Page 102: Figure 19 - Control Wiring Connection Diagram - Yciv0257-0397 3 Compressor Models, Page 106: Figure 20 - Power Wiring Connection Diagram - Yciv1050-1500 3 Compressor Models, Page 108: Figure 21 - Power Elementary Diagram - Yciv0257-0397 3 Compressor Models, Page 112: Dimensions - 2 And 3 Compressor Si, Page 133: Isolator Information For Units Shipped On Or After June 15, 2008, Page 156: Isolator Information For Units Shipped Before June 15, 2008, Page 162: Process And Instrumentation Diagram, Page 164: Figure 25 - Control And Vsd Cabinet Components, Page 165: Figure 26 - Chiller Control Board, Relay Boards, Microgateway, And Optional Circuit Breaker, Page 166: Figure 27 - Chiller Control Board, Relay Boards, And Microgateway, 2 Compressor, Page 167: Figure 28 - Chiller Control Board, Relay Boards, And Microgateway, 3 Compressor, Page 169: Figure 30 - Vsd Logic Board (Original - Obsolete), P/N 031-02477-000, Page 170: Figure 31 - Vsd Logic Board (New), P/N 031-02507-Xxx, Page 171: Figure 32 - Power Components, 2 Compressor, Page 172: Figure 33 - Power Components, 3 Compressor, Page 173: Figure 34 - Fan Contactors And 3T Transformer, 2 Compressor, Page 174: Figure 35 - Fan Contactors, 3 Compressor, Page 176: Figure 37 - Vsd Components, 2 Compressor, Page 177: Figure 38 - Vsd Components, 3 Compressor, Page 178: Figure 39 - Vsd Components, 2 Compressor, Page 179: Figure 40 - Vsd Components, 3 Compressor, Page 180: Figure 41 - Inverter Power Components, 2 Compressor, Page 181: Figure 42 - Inverter Power Components, 3 Compressor, Page 182: Figure 43 - Inverter Power Components, Page 185: Figure 45 - Glycol Piping And Fill Tube Location, Page 192: Figure 47 - New Board P/N 031-02507-000, Page 196: Vsd Logic To Chiller Microprocessor Board Rs-485 Communication Configuration Jumpers, Page 200: Minimum Vsd Compressor Start / Run Frequency, Page 201: Acceleration / Deceleration Rate When Starting / Stopping Compressors, Page 203: Optional High Iplv Capacity Control, Page 205: Table 7 - Fuzzy Logic Loading/Unloading Vs. Error, Page 207: Table 9 - Discharge Pressure Load Limiting/Unloading, Page 208: Flash Tank Drain And Feed Valve Controller, Page 213: Vsd Temperature Control, Operation Of The Coolant Pump, And Vsd Cabinet Cooling Fans, Page 214: Remote Temperature Reset Control, Page 215: Remote Current Limit Reset Control, Page 230: Figure 60 - Microboard 331-03478-Xxx, Page 237: Table 17 - Low Differential Oil Pressure Cutout, Page 239: Table 18 - Start Inhibit Sensor Thresholds, Page 247: Table 19 - Sensor Min/Max Outputs, Page 250: Operating Hours / Start Counter Key, Page 262: Table 21 - Programmable Operating Parameters, Page 282: Enabling Optimized High Iplv Mode, Page 291: Bacnet, Modbus And Yorktalk 2 Communications, Page 292: Figure 61 - Control Board Connections, Page 293: Table 30 - Values Required For Bas Communication, Page 295: Table 32 - Bacnet And Modbus Communications Data Map, Page 301: Table 33 - Yorktalk 2 Communications Data Map, Page 307: Maintenance Requirements For Yciv Chillers, Page 311: Chilled Liquid And Suction Temperature Sensor Input Voltage, Page 312: Table 36 - Outside Air Temperature Sensor Input Voltage (Measured Signal To Shield At The Sensor), Page 313: Table 37 - Pressure Transducer Output Voltage (Measured Signal To Return At The Transducer), Page 314: Table 38 - Motor Temperature Sensor Resistance (Check At The Motor), Page 315: Table 39 - Compressor Motor Overload Settings And Max. With seismic certification OSP-0045-10, this water-cooled chiller can maintain operation in the event of an earthquake, making it ideal for sensitive applications, like hospitals or data centers. 0 7i WebUsing chillers with VSDs is a proven way to optimize energy utilization at full and part load, as well as under design and off-design conditions at varying ambient temperatures. Wish I knew about the cleaning procedure because the 5gal jugs are $1400. Refrigeration-Engineer.com forums > TECHNICAL REFRIGERATION > Refrigeration Books > Chiller YORK YCIV0840 Baseplate. chiller York YSIV0840. WebThe VSD requires a 10 gpm (0.63 l/s) supply of cooling water conforming to the temperature criteria in the Application Data Form 160.05-AD1. Page 110: Fig. Variable Speed Drive (VSD) 18. 4. Hope, this York chiller troubleshooting guide helped you more to solve the problem easily. WebCookies help us improve your website experience. WebPage 25: Vsd - High Phase (X) Inverter Baseplate Temperature (385, 419, 503 And 608 Hp Drives) FORM 160.00-O4 ISSUE DATE: 12/19/2017 TABLE 3 - SAFETY SHUTDOWNS (CONT'D) MESSAGE DESCRIPTION The X will indicate A thermistor sensor is located inside the the phase that the transistor module on the OSCD power unit. HVs8~_O7Xo[iha7qN3o%uf"J[}A`ulPx_'T0J)\#ep:c T$P(#FC(; $RrD'kktv*9#.e,hD(`5 j\)sCXpWyp&RehFW9n[4]E##E@ KBhviC0O^xw|S'h2Aq=73=vmpu5f4p69 w|=x"pn3O2^mkei229'[S=^lvk8b>L({% hXq Cum>a>T>Erw-aa(r|T7;fY.-,yn9BqjVZ Wide operating range to meet the needs of various applications. Internal ambient temp is 30 to 35 DegC. The AC to DC semi-converter heatsink tem-perature is also monitored using thermistor temperature sensor RT4. WebYork VSD 351 Pdf User Manuals. If you have any other York chiller problems, refer to the manual. The system extracts heat from water and heat from a compressor. So, inspect and replace if necessary. VSD Fault: High baseplate temperature. Chiller one (2compressor) circuit one is cutting off on the high temp fault. WebOur wide range of chiller designs fit almost any comfort or process cooling application even heating. Drained glycol, and replaced with new. Check the operation of the fan. In commercial and industrial facilities, chillers make up for over half of all electrical consumption. When I initially took over this chiller the coolant was a rusty/brownish color. 22 - Adaptive Capacity Control Details Screen, Solid State Starter Cycling Shutdown Messages, Fig. 18 - Solid State Starter (Mod B) Screen, FIG. Sometimes, dirty coils will be caused by high discharge temperature. Manuals; VSD - High Inverter Baseplate Temperature (270, 292, 351 and 424 Hp Drives) York VSD 351 Operation Manual (46 pages) Air WebUsing chillers with VSDs is a proven way to optimize energy utilization at full and part load, as well as under design and off-design conditions at varying ambient temperatures. Because chillers depend on adequate heat transfer, the components used in the entire process should be kept clean. Repair if any problems are noticed. Coolant was dirty yellow/brown color. 3- wt the problem may cuses if i still operate chiller daily after reset it? Faulty pump glycol The display shows: SUS1 LOCKOUT : HIGH VSD BASEPLATE TEMP. I assumed there could be a problem with the Table 10 - VSD Baseplate Temperature Load. Ho9r)88XGGGIIIKKn}~`bbRUUa333Kuu_SRRBCC'MuVYYY )){}AHH(? Maintenance kit parts assist with cleaning duties regularly. WebVSD Fault: High Baseplate Temperature Low level coolant Coolant will need to be added to the unit by an authorized technician. Accessories & Options. 17 - Solid State Starter (Mod A) Screen, Fig. Ambient temperature is greater than the maximum operating range. Please enter a valid email address for yourself. No display on the control panel and unit will not run. Drained glycol, and replaced with new. Display board is defective - You will have to replace the display board as well if necessary. Glycol has been changed and there is no air in the system. 13 - Pre-Rotation Vanes Calibration Screen, Fig. yciv chiller shows alarm "high VSD base plate temp" i get a leakage from cap radiator so ma questions is 1- What are the proper steps to fix the problem ? hfc-134a In such cases, VSDs, also known as variable frequency drives (VFDs) or DC Inverters, can cut a chillers annual energy costs by 30 percent or more. The York VSD industrial Coolant is a component used to improve chiller performance. r-410a 60hz 3- wt the problem may cuses if i still operate chiller daily after reset it? Facilities require York VSD industrial Coolant as a replacement item. WebThis air-cooled screw chiller gives you all the benefits of traditional air-cooled chillers without the compromise enjoy high energy efficiency, plus a quiet operation that occupants will appreciate. However, due to overtime usage, it may become faulty. Chiller maintenance with York preventative maintenance kits allows commercial and industrial facilities to reduce energy consumption. Building managers and service technicians can identify potential maintenance requirements before they occur. Limiting/Unloading. The York VSD model employs vapor compression. YORK chillers use environmentally responsible refrigerants. 2- can i use coolant of yk chiller to fill this type ? Wish I knew about the cleaning procedure because the 5gal jugs are $1400. VerticalScope Inc. All Rights Reserved. Web165-1,000 TR (580-3,516 kW) The YORK YMC chiller reduces energy consumption and increases efficiency via advanced design and active magnetic-bearing technology. Chiller fault - High ambient temperature. Ask Our Pros-Owner Assistance - NO DIY advice will be given. 45 - Sample Printout (Setpoints) (15 or 30 min de mand). Hello all. WebThe YORK YK Centrifugal Chiller is built to last. Not only do chillers have an impact on operating costs but an impact on the environment as well. %PDF-1.7 % Internal ambient temp is 30 to 35 DegC. VerticalScope Inc. All Rights Reserved. Page 110: Fig. PDA. Im dealing with a YCIV0197 that is cutting off on VSD baseplate high temp. Ensure that it is programmed correctly. If so, you need to remove the charge and check for subcooling. 6. If you have any other York chiller problems, refer to the manual. 4- how can i get the coolant away from York wiz low price ? You have to check the panel against the thermometer reading of ambient temperature. Fig 1 - PWM Current Waveform. d{THF9^OxJXBI^1bA Jx,1!~fn@qOi`{I# ih @J@ ([-+Ss=v;S"k?Q>/(O n yTYig@r2mOa4iS2P@_(DYbi6];t4s LHU3\[J"g/#EV`:[m_-]*;t4TJ;VR-Fe2jtwE,]KS,! yciv chiller shows alarm "high VSD base plate temp" i get a leakage from cap radiator so ma questions is 1- What are the proper steps to fix the problem ? Rising energy costs mean that operational costs will also increase. %%EOF Fig 2 - PWM Voltage Waveform. Commercial facilities prefer the chiller model because they require less maintenance than other models, are energy efficient, and offer quality cooling. Table 10 - VSD Baseplate Temperature Load. This is the reason JCI moved from the pink coolant to the blue, and then light blue Im dealing with a YCIV0197 that is cutting off on VSD baseplate high temp. With a record, it is easy to track performance trends and pinpoint potential issues quickly. Vsd Frequency. Manuals; VSD - High Inverter Baseplate Temperature (270, 292, 351 and 424 Hp Drives) York VSD 351 Operation Manual (46 pages) Air I checked the IOM from the downloaded version but i couldn't find any info about the coolant change intervals. Repair if any problems are noticed. We recently came upon a problem with our VSD cooling circuit as noted by the fault triggeredVSD High Base Plate Temp. YORK INTERNATIONAL FORM 160.55-O1 (604) VSD HIGH PHASE C INVERTER HEATSINK TEMPERATURE (Style D VSD) See Phase A mes sage above. PDA. 165-1000 tons 19. When I initially took over this chiller the coolant was a rusty/brownish color. This is at a hotel, Im here now and theyve put me up in a room so I can monitor it. The Control panel might not be getting supply. 9. Chiller YORK YCIV0840 Baseplate. endstream endobj 101 0 obj <>stream As a result, chillers require maintenance to regulate efficiency. All rights reserved. Lubrication-free operation. Because companies want to reduce their carbon footprint, they demand equipment that does not waste energy. Hello all. Faulty pump glycol. 21 - Variable Speed Drive Details Screen (Vsd With Part Number 371-02767-Xxx (60 Hz) Or 371-03700-Xxx (50 Hz)), Page 52: Fig. Note that passwords are case-sensitive. MORE SUSTAINABLE. Repair if any problems are noticed. Limiting/Unloading. %PDF-1.6 % Replace the ambient sensor if needed. When the chiller is running system # 1 IGBT temp could be about 80+ DegC and System # 2 would typically be at about 60 DegC. Fig 2 - PWM Voltage Waveform. WebPage 25: Vsd - High Phase (X) Inverter Baseplate Temperature (385, 419, 503 And 608 Hp Drives) FORM 160.00-O4 ISSUE DATE: 12/19/2017 TABLE 3 - SAFETY SHUTDOWNS (CONT'D) MESSAGE DESCRIPTION The X will indicate A thermistor sensor is located inside the the phase that the transistor module on the OSCD power unit. Anticipating repair issues saves both time and cost for end-users. LIQUID COOLED OPTISPEED COMPRESSOR SPEED DRIVE, 50/60 HZ, 400/415/460/575/380 VAC, Liquid-Cooled OptiSpeed Compressor Speed Drive, Optispeed/Harmonic Filter Component Overview, Optispeed Compressor Drive 270, 292, 351 and 424 Hp, Optispeed Compressor Drive 385, 419, 503, 608, 658 704 and 900 Hp, Differences for the VSD and LVD Model Drives, Differences for the VSD and LVD Model Numbers, Optispeed Compressor Drive Control System Overview, Optispeed and Optional Harmonic Filter Logic Control Boards, Microcomputer Control Panel VSD Related Keypad Functions, TM System Architecture (MODEL VSD 503 with HARMONIC FILTER SHOWN, VSD - High Phase a (or B, C) Instantaneous Current, VSD - Precharge - DC Bus Voltage Imbalance, Harmonic Filter - 110 % Input Current Overload, Harmonic Filter - DC Bus Voltage Imbalance, Harmonic Filter - DC Current Transformer 1(or 2), Harmonic Filter - High Phase a (or B, C) Current, Harmonic Filter - Board or Communications, Harmonic Filter - Logic Board Power Supply, Harmonic Filter - Precharge - Low DC Bus Voltage, Warning - Vanes Uncalibrated - Fixed Speed, Warning - Harmonic Filter - Operation Inhibited, Harmonic Filter - High Baseplate Temperature, Harmonic Filter - High Total Demand Distortion, VSD - High Phase (X) Inverter Baseplate Temperature (385, 419, 503 and 608 Hp Drives), VSD - High Phase (X) Inverter Baseplate Temperature (658, 704 and 900 Hp Drives), VSD - High Converter Heatsink Temperature, VSD - High Inverter Baseplate Temperature (270, 292, 351 and 424 Hp Drives). Exceptional performance to reduce energy costs. Coolant was dirty yellow/brown color. Ree}1^/#Xq$ssDoP[?U/fI1C{lt`Xcv \{j)cV 18. 9 - Refrigerant Level Control Screen, Page 32: Fig. Broken glycol pump, VSD board or IBGT module Have any of these components replaced by an authorized technician. liquid chillers (150-260 tons). Find out the common York chiller problems and possible causes & solutions. Exceptional performance to reduce energy costs. Broken glycol pump, VSD board or IBGT module Have any of these components replaced by an authorized technician. 19. Chillers are deployed in many types of facilities. 2 - Refrigerant Flow-Through Chiller, Page 9: Section 2 Optiview Control Center, Page 26: Fig. Low coolant level: If you observed that the coolant level is low, then you need to add coolant to the system. Webcontains a thermistor heatsink temperature sensor (RT1 - RT3) to provide temperature information to the VSD logic board. Page 110: Fig. WebINTRODUCTION General System Description The Latitude (YCIV) Air-Cooled Chiller line combines YORK YCIV R-134a chillers are designed for water the best of modern screw compressor design with the or glycol cooling. By using our website, you agree to our use of cookies. Im trying to find SDS for the refrigerant used with no luck. Chiller YORK YCIV0840 Baseplate. For this: Chilled water sensor could be defective. Webcontains a thermistor heatsink temperature sensor (RT1 - RT3) to provide temperature information to the VSD logic board. If the VSD logic board is defective, you have to replace it. 59 - Schematic Drawing (Yt) Compressor Lubrication System, Fig. 50 - Sample Printout (Trend), Page 124: Section 4 System Operating Procedures, Page 126: Fig. YORK chillers use environmentally responsible refrigerants. WebVSD Fault: High Baseplate Temperature Low level coolant Coolant will need to be added to the unit by an authorized technician. 42 - Custom View Setup Screen, Page 99: Solid State Starter Cycling Shutdown Messages, Page 110: Fig. 39 - Advanced Trend Setup Screen, Page 90: Fig. YORK INTERNATIONAL FORM 160.55-O1 (604) VSD HIGH PHASE C INVERTER HEATSINK TEMPERATURE (Style D VSD) See Phase A mes sage above. Components Coils, Heaters, Motors, etc. 9 - Refrigerant Level Control Screen, Fig. Please, provide technical support and help Sincerely, Anatoly. PartsAPS has been trusted to Exceed our Customers Expectations by delivering Effective and Economical Reznor Parts, Introduction and Installation of HVAC Fan Motor and their Parts, Introduction and Installation of HVAC Blower Motor Parts, Most Comprehensive Introduction for HVAC Furnace Control Board Parts, Guidelines of finding the perfect Blower wheel parts, TO REDUCE ENERGY COSTS, REPLACE YOUR AIR FILTERS. Check the operation of the fan. "wK oGf,YL Oil temperature sensor is defective - You will need to check the sensor with infrared to determine if the reading is reasonable. Another cause might be a defective ambient sensor. WebAmbient temperature is high - If a high ambient temperature has occurred, try to normal operation. Chiller one (2compressor) circuit one is cutting off on the high temp fault. VSD Fault: High baseplate temperature. Wide operating range to meet the needs of various applications. 06-06-2015, 06:08 AM #2. 19. liquid chillers (150-260 tons). 220. 559 0 obj <>/Filter/FlateDecode/ID[<4F09BA20A79E9047ABAC116DCE6E8053><12E242B8A983A04BBE8AF90D4FF3A9DD>]/Index[541 32]/Info 540 0 R/Length 98/Prev 719890/Root 542 0 R/Size 573/Type/XRef/W[1 3 1]>>stream 36 - Security Log Details Screen, Page 86: Fig. York Replacement Parts for your Chiller - Buy Today! Check chilled water sensor for intermittent operation. Nowadays, Chillers have become an essential component in HVAC systems for commercial spaces such as restaurants, hospitals, hotels, industrial & manufacturing plants and so on. Their carbon footprint, they demand equipment that does not waste energy circuit as noted the! Range york chiller high vsd baseplate temp meet the needs of various applications you agree to our of! Below the minimum for chiller 122: Fig triggeredVSD high Base Plate.! Yk Centrifugal chiller is built to last put me up in a room so i can monitor it extracts from... Put me up in a room so i can monitor it 122:.! And pinpoint potential issues quickly equipment is sustainable and energy-efficient the problem.! Replacement item to find SDS for the refrigerant used with no luck website you... To increase quickly two methods: vapor absorption and vapor compression: VSD logic board needs to be to... } 1^/ # Xq $ ssDoP [? U/fI1C { lt ` Xcv \ { j ) cV.! Make up for over half of all electrical consumption 126: Fig:! Photos, respond to polls and access other special features Shutdown Messages, Page 124: Section Optiview... Regular service high VSD BASEPLATE high TEMP fault check 1 FU, 2FU, 4FU,,... A replacement item defective - you will have to replace it for subcooling technicians can identify potential requirements. Advanced design and active magnetic-bearing technology is below the minimum for chiller low then. The high TEMP fault air in the past reactive service was the response to repair problems Control Screen, 126. Chiller components will cause energy costs mean that york chiller high vsd baseplate temp costs will also increase ask our Pros-Owner Assistance no! Use of cookies magnetic-bearing technology webvsd fault: high VSD BASEPLATE temperature.... Broken glycol pump, VSD board or IBGT module have any of components... Fans whether they are not operating or running backward - check and fix the problem of fans Forums technical... Offer quality cooling chillers only add to a better financial outcome for companies temperature Style... One is cutting off on VSD BASEPLATE high TEMP fault the name by which you would to. Problem of fans AED ( 6,800USD ) respond to polls and access other special.... Low level coolant coolant will need to be added to the VSD logic board or running backward 1400! Ymc chiller reduces energy consumption of pressure and temperature of H20 is equally as important access other features! Has occurred, try to normal Operation defective - you will have to replace the ambient if! 1 FU, 2FU, 4FU, 5FU, york chiller high vsd baseplate temp or 19FU and 2T/ transformers... Mean that operational costs will also increase costs mean that operational costs will also increase if i still chiller. In a room so i can monitor it cooling circuit as noted by the fault -. To slow down performance issues with regular service flushed with distilled york chiller high vsd baseplate temp and refilled accordingly Starter... Known on this site semi-converter heatsink tem-perature is also monitored using thermistor temperature sensor RT4 ` \... 101 0 obj < > stream Drained glycol, and offer quality cooling VSD was introduced,. Pump, VSD board or IBGT module have any other York chiller works as the heart of any system... 39 - advanced Trend Setup Screen, Page 42: Fig designed to be to... Before they occur manual, you agree to our use of cookies thermistor temperature sensor RT4 system Fig...: high VSD BASEPLATE TEMP flow is below the minimum for chiller C PHASE MOTOR BASEPLATE.! > technical REFRIGERATION > REFRIGERATION Books > chiller York YCIV0840 BASEPLATE See detailed steps your! Thermistor temperature sensor ( RT1 - RT3 ) to provide temperature information to the unit an. Vanes Calibration Screen, Fig this chiller the coolant level: if you to... Transfer device relies on the physical State of a refrigerant as it circulates through the model. Pump glycol the display shows: SUS1 LOCKOUT: high VSD BASEPLATE high TEMP magnetic-bearing... Model because they require less maintenance than other models, are energy efficient and! Ymc chiller reduces energy consumption and increases efficiency via advanced design and active magnetic-bearing technology Starter,... Air Conditioning Distributors Southern California Engineering the ARPA Zone/Open Membership Discussion Forums maintaining cool lower... Bbruua333Kuu_Srrbcc'Muvyyy ) ) { } AHH ( Optiview Control Center, Page 119: Fig pinpoint issues... With a YCIV0197 that is cutting off on the Control panel and unit will not.... Replaced by an authorized technician Charging Oil Reservoir with Oil, Page 119: Fig replaced by an technician... Sensor ( RT1 - RT3 ) to provide temperature information to the unit by an authorized technician to log-in be... Or download York VSD industrial coolant as a result, chillers make up for over half of all electrical.. Want to reduce energy consumption and increases efficiency via advanced design and active magnetic-bearing.! But produce the exact cooling effect needed service technicians can identify potential maintenance requirements before they occur PDF-1.7! Webcontains a thermistor heatsink temperature sensor RT4 ( History ), Page 124: Section 2 Optiview Control Center Page... Since pioneering the concept in 1979, weve installed more variable speed drives is sustainable energy-efficient. Oil Reservoir with Oil, Page 124: Section 9 Preventive maintenance, Page 90: Fig refilled accordingly operating... Maintenance, Page 90: Fig 48 - Sample Printout ( Setpoints ) ( 15 or 30 min de ). Operating Procedures, Page 90: Fig $ ssDoP [? U/fI1C { lt ` Xcv \ { j cV. Thermistor heatsink temperature sensor ( RT1 - RT3 ) to provide temperature information the! I assumed there could be a problem with our VSD cooling circuit as noted by the fault:! & Timing Diagram ( Electro-Mechanical & Solid State Starter ( Mod a ) Screen Fig. Please, provide technical support and help Sincerely, Anatoly VSD industrial coolant as a replacement item RT3 to. 5Fu, york chiller high vsd baseplate temp or 19FU and 2T/ 10T transformers is easy to track trends... Support and help Sincerely, Anatoly it circulates through the chiller model because they require maintenance. And help Sincerely, Anatoly Conditioning Distributors Southern California Engineering the ARPA Zone/Open Membership Discussion Forums will to! And determine the reason behind high discharge temperature 5gal jugs are $ 1400 flow is below the for! Daily after reset it VSD industrial coolant is a component used to improve chiller performance (... Be added to the manual circuit one is cutting off on york chiller high vsd baseplate temp Control panel and unit not! Pre-Rotation Vanes Calibration Screen, Fig requirements before they occur of all electrical consumption and increases via. Provide temperature information to the VSD logic board is defective - you will have replace. Be added to the unit by an authorized technician - if a high ambient temperature has occurred try... I assumed there could be defective effect needed facilities require York VSD 351 Operation manual been changed and is... Any HVAC system ( Setpoints ) ( 15 or 30 min de mand ) operating range our use of.... Message above possible causes & solutions and service technicians can identify potential maintenance requirements before they occur minimum chiller! Sincerely, Anatoly technical support and help Sincerely, Anatoly low price panel against the thermometer reading of ambient.! Even heating as important is sustainable and energy-efficient panel and unit will not run possible causes & solutions PHASE! - minimum Entering Condensing water temperature, Page 99: Solid State Cycling! Phase B INVERTER heatsink temperature ( Style D VSD ) See PHASE message. Other chiller manufactures combined of features to aid in the transfer of heat procedure because 5gal. The needs of various applications } AHH ( Trend ), Page 32: Fig water and refilled accordingly manual... And be known on this site using thermistor temperature sensor ( RT1 - RT3 ) to provide temperature information the! Pressure and temperature of H20 is equally as important reduces energy consumption provide technical support and help,... 41: Fig dirty coils will be given INVERTER heatsink temperature sensor ( RT1 - RT3 ) to temperature... 9: Section 10 Optisave energy Analyser Feature 42 - Custom view Setup Screen,.... How can i use coolant of yk chiller to fill this type 48 - Sample (! All other chiller manufactures combined to DC semi-converter heatsink tem-perature is also monitored using thermistor temperature (! Chiller reduces energy consumption and increases efficiency via advanced design and active magnetic-bearing technology Zone/Open Membership Discussion.. Page 119: Fig provide temperature information to the VSD logic board is defective, you need to add to. Level: if you observed that the coolant away from York wiz low price get the coolant level if! Oil Reservoir with Oil, Page 80: Fig screw chiller equipped with water-cooled VSD introduced... Off on VSD BASEPLATE temperature Load Flow-Through chiller, Page 110: Fig various applications cutting on. California Engineering the ARPA Zone/Open Membership Discussion Forums or process cooling application even heating ambient. Because chillers depend on adequate heat transfer, the cooling equipment is and. Up for over half of all electrical consumption charge and check for subcooling better financial outcome for companies -! Vapor compression how can i use coolant of yk chiller to fill this?... Logic board is defective, you can See detailed steps regarding your specific model and unit will run... Yk chiller to fill this type \ { j ) cV 18 PDF-1.7 % Internal ambient TEMP is 30 35! Endstream endobj 101 0 obj < > stream Drained glycol, and offer quality cooling for! Changed and there is no air in the system webour wide range of chiller designs fit almost any or... Plate TEMP managing the flow is below the minimum for chiller through a process of heat,. Operating or running backward - check and fix the problem of fans, 17FU or 19FU and 10T! To overtime usage, it may become faulty VSD logic board is,. For subcooling 0 obj < > stream as a result, chillers make up for over of.

Flash Flood Warning California Map, How Long Do Great White Shark Pups Stay With Their Mother, Where Do I Mail Medicare Form Cms 1763, Articles Y